Biodiversity net gain

We work alongside developers, landowners, local authorities, planning consultants, contractors, and architects—as well as habitat banks, responsible bodies, and offset providers—to ensure your project is fully compliant with biodiversity net gain (BNG) requirements. Beyond basic legislation compliance, we actively leverage our capability to support local authorities in developing and establishing their own habitat banks, providing the long-term strategic solutions needed to unlock regional development.

TRUSTED BY LEADING NAMES
NURTURING NATURE

Delivering net gains, or benefits, for biodiversity isn’t a nice-to-have. It’s a legal requirement for most developments and land management projects in England and Wales.

Biodiversity loss is a global issue, but it’s particularly prevalent in the UK – one of the most nature-depleted countries in the world. When it comes to new homes, roads, rail networks, and more, enhancing biodiversity is therefore integral to development. It matters because human health, food security, economic stability, and planetary resilience all depend on it.

The Environment Act 2021 was introduced as part of a wider plan to protect nature more intently and directly. Under it, many developments in England must deliver a minimum BNG of 10% compared to the pre-development baseline. Similarly, Welsh policy requires new developments to deliver a net benefit for biodiversity (NBB). However, unlike BNG, NBB doesn’t require a minimum biodiversity uplift for every project. Instead, it’s up to the relevant local authority to agree on what’s appropriate and proportionate for the project. 

Our role in BNG and NBB is multifaceted. From pre-planning strategy and early assessments through to design, implementation, reporting, monitoring, and management, our ecologists work closely with your teams to ensure projects are both compliant and commercially viable – fully tailored to the needs of your development.

STREAMLINING DELIVERY

Supporting detailed biodiversity net gain planning

When a local planning authority (LPA) reviews your planning application, they’ll require a fully evidenced biodiversity net gain assessment. If this is absent or insufficient, your development won’t be approved – simple. Informed by a habitat condition assessment, as well as a field survey of all habitats that will be impacted by the proposal, this documentation includes:

  • Statutory biodiversity metric – using DEFRA’s BNG tool to calculate pre- and post-development biodiversity unit values

  • Habitat condition assessment – a structured approach recording the current quality and  healthof site habitats 

  • Habitat type assessment: a baseline evaluation to classify the exact habitat categories present on-site, establishing their inherent distinctiveness and ecological value before development begins.

  • Baseline habitat map – a scaled drawing to show plants, trees, and land features on a specific piece of land before development work

  • Proposed habitat map – a diagram illustrating plans for post-development habitat creation, retention, and enhancement areas

But the journey doesn’t end once the planning application has been granted. To ensure any ecological commitments you make are sustained, the LPA will then condition a habitat management and monitoring plan (HMMP) that holds you accountable for an extended period (typically at least 30 years). As an experienced biodiversity net gain consultant, it’s our role to help you make sense of – and deliver – these obligations with confidence.

- Lorem ipsum

Ecological intelligence at every project stage

Biodiversity net gain is a commitment that spans years, if not decades, from first concept to long-term stewardship. Our specialists support you at every stage, giving you clarity on initial feasibility plans and the confidence to maintain ongoing compliance as the development evolves.

Strategy and feasibility advice

Early-stage guidance shapes decisions around what’s achievable on your site. At this point, we might carry out a preliminary ecological appraisal (PEA) to lock in your development’s true baseline, mapping habitats, and assigning condition grades. This walkover feeds the statutory biodiversity metric, giving you a definitive and defensible starting score to inform planning.

Early-stage guidance shapes decisions around what’s achievable on your site. At this point, we might carry out a preliminary ecological appraisal (PEA) to lock in your development’s true baseline, mapping habitats, and assigning condition grades. This walkover feeds the statutory biodiversity metric, giving you a definitive and defensible starting score to inform planning.

A PEA alone rarely satisfies formal requirements. Where protected species may be present, we schedule seasonally timed follow-up surveys, then build the baseline data into a full biodiversity net gain survey and assessment report. This combines metric calculations, UKHab classifications, and, if a site is intersected or bordered by a watercourse, activities such as modular river physical (MoRPh) surveys.

Design and strategy

We lead with on-the-ground thinking, illustrating site and land designs that prioritise avoidance, enhancement, and creation wherever a site allows it. Only where a development genuinely can’t meet its needs directly do we coordinate offsite gains or offsetting as a last resort – liaising with habitat banks, offset providers, and Natural England to secure a compliant, workable solution.

Programme implementation

Once planning permission has been granted and work begins, we can support with specialist oversight. An ecological clerk of works (ECoW) checks that approved methodologies are being followed correctly and provides a reassuring on-the-ground presence to catch emerging risks early, protecting both habitats and your development timeline from unplanned delays or breaches.

BNG reporting

Clear, accurate reporting is essential for planning submissions, but it’s also key for the discharge of conditions once your development is complete. We prepare the documentation needed to satisfy a biodiversity net gain planning condition and gain LPA sign-off, translating technical survey data and practical contractor work into defensible evidence that stands up to scrutiny.

Management and monitoring

BNG obligations typically run for at least 30 years, and you will be held to them. We create and deliver HMMPs that detail how habitats will be maintained, by whom, and how progress will be tracked and reported throughout this period, giving you a defensible framework that protects your investment and keeps commitments on track long after handover.

Developers can’t default to offsetting their impact. They must follow the priority list of actions set out in the Biodiversity Gain Hierarchy – except for irreplaceable habitats, which are fully protected.

Avoidance and mitigation

Avoid damaging high-value habitats first. Where impacts are unavoidable, minimise and mitigate them.

Onsite enhancement

Compensate for adverse effects on onsite habitat by upgrading and restoring them, where possible.

Onsite creation

Create new onsite habitat if the required enhancements cannot be fully achieved.

Offsite gains

Secure verified offsite conservation gains if the development site cannot deliver sufficient improvements.

Statutory credits

Purchase statutory biodiversity credits as a last resort only, when offsite gains cannot be secured.

what our clients say about us
  • "Wildwood Ecology has supported Stonewood Group with some complex projects, which are always approached positively and proficiently. Their support and commitment exceed expectations, providing valued assistance both during and post planning. The team offers expert advice and continuous involvement, which gives us confidence that we can deliver the best possible scheme, providing high-quality biodiversity enhancements that benefit the environment and local community."

    Holly Simkiss

    planning manager

More than a compliance exercise, nature-led design can multiply commercial value

There are countless ways to deliver biodiversity net gain. Examples include restoring local ponds and rivers so species can anchor, feed, and reproduce, or creating wildflower meadows that act as green corridors for wildlife while providing essential pollen for bees and butterflies. These enhancements shouldn’t be viewed as bottlenecks. Approached correctly, they can add significant commercial value to a development – boosting its amenity and wellbeing appeal, strengthening its placemaking credentials, and lifting long-term desirability for occupiers, buyers, and investors alike.

Find anything

Explore the latest industry updates on ecology and environmental practice, access specialist advice and guidance, and download scientific research studies on the Terrnea hub.

See the latest

News and insights

Our library provides a wide range of reading material for your leisure – including the latest Terrnea news, educational insights to shape your development strategies, and proven results across national client projects.

Our services

Our support spans well beyond the scope of project planning and compliance. Discover how we mitigate development risks and unearth opportunities across a full range of ecological and environmental services.

Ecology and Biodiversity

Our ecologists work across the life of a project, from early site assessment and planning through construction to longer-term management and monitoring.

Explore service

Geo-environmental and Geotechnical

Our geo-environmental and geotechnical teams investigate ground, water and site conditions to understand the constraints that could affect development, construction and land use.

Explore service

Environmental Planning and Assessment

Our environmental planning and assessment teams work with developers, planning and design teams, landowners and public bodies to understand the environmental considerations associated with a site or proposed development.

Explore service

Pollution, Prevention and Control

Our environmental specialists assess pollution risks associated with development, construction and industrial operations. We investigate existing site conditions, assess potential effects on the surrounding environment and advise on measures to prevent or manage pollution.

Explore service

STILL HAVE QUESTIONS? GET IN TOUCH

Lorem ipsum dolor sit amet, consectetur adipiscing elit.

  • Not all new developments in England need to demonstrate biodiversity net gain. Exemptions include projects where a planning application was made before day one of mandatory BNG on 12 February 2024. Other developments below the threshold include:

    • Those that don’t impact a priority habitat and impact less than 25 square metres of on-site habitat or five metres of on-site linear habitats such as hedgerows

    • Householder applications as defined within article 2(1) of the Town and Country Planning (Development Management Procedure) (England) Order 2015 – including home extensions, conservatories, or loft conversions

    • Proposals for sites that are less than 0.2ha in area and don’t impact onsite priority habitats (such as ancient woodland).

How can we help

Put habitats at the heart of your decision making

Whether you’re working to BNG requirements in England, NBB policy in Wales, or another regulatory framework entirely, let our biodiversity net gain consultants decode exactly what your development needs to succeed.


Get in touch